Contractors ask us this almost every week, and the honest answer is that both have a place. Plastic panels, injection moulded with a full computer-controlled line, handle acid and alkaline mixes well and suit high-volume batch production of smaller units. Steel moulds carry the heavy end of the work.
For slope protection, steel wins on repeat use. A Q235 steel mould with about 3 mm plate and 5 mm ribs handles hundreds of pours without warping, and the arch-style units keep their shape because the ribs spread the load. We weld with argon and cut with CNC, then set a demolding taper so the concrete lets go cleanly. The steel body serves 3 to 5 years in normal service, and with hot-dip galvanizing the weather resistance stretches to about 12 years.
Speed is the other difference. Our modular steel moulds go together with one or two workers, and the demoulding window runs 2.5 to 6 hours, pushing daily output to 12 to 18 pieces. Plastic forms are lighter to carry, but they flex on big pours and wear faster where the concrete is abrasive.
Our usual advice is simple. Batch production of small units on a clean site suits plastic. Slopes, highways and riverbanks suit steel. For most contracts, the steel mould pays for itself in the first season.