What Are The Supporting Facilities For Well Molds?

Jan 15, 2026 Leave a message

The supporting facilities for well molds mainly include various equipment and auxiliary systems used to support the entire process of production, installation, demolding, and maintenance. Based on publicly available information and different application scenarios (such as municipal inspection wells, caissons, and vertical shafts), they can be summarized as follows:

 

General Supporting Facilities

Processing Equipment: Large cutting machines, bending machines, welding machines, etc., used for the manufacturing and assembly of the mold body.

 

Lifting and Positioning Equipment: Hand-operated hoists, winches (1~5t), cranes, etc., used for template assembly, position adjustment, and demolding.

 

Demolding Auxiliary Tools: Release agent spraying equipment, specialized demolding mechanisms (such as jacking devices), etc., to ensure smooth demolding of concrete components with intact surfaces.

 

Supporting and Stabilizing Structures: Fixing plates, lifting plates, stabilizing rope plates, etc. (especially in caisson or shaft construction), used to ensure the stability of the mold during the pouring process.